15 September, 2023 / Sharjah / Piling & Shoring

List of Piling & Shoring Projects

Trench Box Shoring System for Sewer & Irrigation Trunk & Main Connection Jumeirah Park to Al Furjan - Micro Tunneling Works - Dubai
Trench Box Shoring System for Sewer & Irrigation Trunk & Main Connection Jumeirah Park to Al Furjan - Micro Tunneling Works - Dubai

 

Contract 301-504 Shoring Works for EPS & TSE line form 5th Industrial Area Main STP to Sea- Sharjah, UAE
Contract 301-504 Shoring Works for EPS & TSE line form 5th Industrial Area Main STP to Sea- Sharjah, UAE

 

Temp. Shoring System using Steel Piles with Anchoring System - R881/2A2 Improvement of Parallel Roads- Construction of Underpasses, Dubai
Temp. Shoring System using Steel Piles with Anchoring System - R881/2A2 Improvement of Parallel Roads- Construction of Underpasses, Dubai

 

Piling Works for Proposed Bldg. (G+5P+H/C+43 Type+1 service +Roof) Plot # 147 Al Mamzar Sharjah, UAE
Piling Works for Proposed Bldg. (G+5P+H/C+43 Type+1 service +Roof) Plot # 147 Al Mamzar Sharjah, UAE

 

Piling Works for (G+M+5F) Plot # 1424, Industrial Area 6 - Sharjah
Piling Works for (G+M+5F) Plot # 1424, Industrial Area 6 - Sharjah

 

Shoring Works for Sheet Pile Driving & Receiving Pits + Deep-well Works with bracing at Business Bay - Dubai
Shoring Works for Sheet Pile Driving & Receiving Pits + Deep-well Works with bracing at Business Bay - Dubai

 

Piling Works for Contract R989 Footbridges on Al Ittihad Road, King Faisal & Abdul Aziz Street, Sharjah, UAE
Piling Works for Contract R989 Footbridges on Al Ittihad Road, King Faisal & Abdul Aziz Street, Sharjah, UAE

 

Piling Works for Bridge Pile Foundation - Contract 700-503 Alternative Access to Int Airport Sharjah, UAE
Piling Works for Bridge Pile Foundation - Contract 700-503 Alternative Access to Int Airport Sharjah, UAE

 

Shoring Works  - VIDA Hotel Service and Branded Apartments Al Jada - Sharjah
Shoring Works - VIDA Hotel Service and Branded Apartments Al Jada - Sharjah

 

Several other piling and shoring projects include:

  • Shoring Works - ARADA Development - Nasaq Residential Bldg. (B+G+9F) Plot # 15/328 - D003 & D004, Sharjah U.A.E.
  • Shoring Works -Temporary Sheet Pile for Consutruction of Bridge on Road Sheik Mohamed Bin Zayed Road at Tallah - Ajman (2021-124) (DJ609) U.A.E
  • Shoring Works - Contract No. 200W2021 2X10 MIG RCC Prestressed Tank and Pumping Etihad We -Water Station at Al Ghayl New WDC RAK, U.A.E.,
  • Piling Works for Building (G+3P+12 TYP) Plot # Gov.13/14 (166 Mulk) Al Marijiah - Sharjah , UAE.
  • Piling Works for Proposed Building G+5P+15 Typical, Gov No. 768 on Plot No. 605 Mulk in Abu Shagara at Sharjah. U.A.E.
  • Shoring Works for Masaar Development Infrastructure Sales Precinct and Buffer Zone Infrastructure, Sharjah, U.A.E.
  • Temp. Shoring Trench Box Shoring System Potable Water Pipeline From Khorfakkan to Shees Village - Sharjaj. U.A.E.
  • Piling Works for Steel Pipe Pile for Foundation - Existing of Expansion Margham HP Injection Line System. Dubai, UAE.,
  • Temp. Shoring Works for Supply, Installation and Extraction of Shoring System by King Post (H-Beam) in fills with RC at Khor Fakkan Road Project.
  • Temp. Shoring Works for King Post - Proposed Building (G+3) plot # 4457 at s Muwailah, Sharjah. UAE.,
  • Temp. Shoring Works for Sheet Pile Construction of Storm Water Drainage Network and Pumping Station for Road in Saifa Area at Ajman. UAE.
  • Shoring Works for Design & Build 132/11 Kv Seif Deira Sub-Station at Palm Deira, Dubai - UAE.,
  • Shoring Works for Mina Zayed Fisherman's Market Plot # P-125 Sector Harbour at Abu Dhabi - UAE
  • Shoring Works for SBH System for Green - Relocation of Existig Sevices - 132 Kv. Substation, Telal Thanya - Dubai. UAE
  • Shoring Works for King Post (I-Beam) for ADNOC Service Station Tank at Remraam - Dubai UAE.
  • Shoring Works for D-424 ENOC Filling Station No. 1076 Dubai. UAE.
  • Shoring Works for S-004 [SH0001] Dubai Harbour-Roads and Infrastructure Works - Package 1 Dubai UAE.
  •  
  • Shoring Works for Contract 301-501 Construction of Foul Drainage Network at Area Close to Sea to Kalba City. UAE
  • Shoring Works by sheet pile & bracing NDRC Driving & Receivng Pits and King post with Tieback Anchors.
  • Shoring Works for (G+1F) Shoping Mall + (G+M) Office, Plot No. 314054001, Rasal Khaimah UAE.
  • Temp. Shoring Works for DU1533-Road & Infrastructure Works for Liwan District Phase - 2 at Dubai Land, UAE.
  • Shoring Works for Refurbishment of Zabeel Palace 2 (FP-1007000009) Plot # (337-294) at Zabeel Second Dubai. UAE.
  • Propsed (2B+G+1) Twin Villa at Plot # 978 (Mulk 286) Al Shahba, Sharjah. UAE.
  • Shoring Works for Micro Tuneling Driving & Receiving Pits Works PT-160 Dubai Design District Infrastructure and Roads Works. - UAE.
  • Shoring Works for Sheet Pile Driving & Receiving Pits + Drilling of Deepwell Works Blue Water Island Chilled Water Network, Dubai
  • Drilling Deep Well Dewatering Works - R989 Access to Blue Water Island, Dubai
  • Shoring Works for Permanent I-Beams at Al Bait Hotel - Sharjah - UAE.
  • Shoring Works for Sheet Pile Comprehensive Imporvement of the Parallel Road R881-2A1, - Business Bay - Dubai
  • Shoring Works for Construction of an Integrated Sewerage System in Western Region. Mirifa STP Civil Works. - AbuDhabi
  • Strom Water Pump Station for M/s. Ajman Municipality, near Rashidiyah Towers, Al Rashidiyah - Ajman.
  • Deep Well Works - Al Zorah Resort Infrastructure - Package -2 - Ajman. UAE
  • Sheet Pile Shoring Works with Bracing for AKOYA by DAMAC Plot # 676-1061, Al ebiah Third, Dubai Land - Dubai UAE.
  • Shoring Works for 9022 Fire Fighting Pump Station. @ Al Khawaneej Labour City - Dubai. UAE.
  • Trench Box Shoring System for Replacement for Pipe line at Al Majan Area, Al Barari, Dubai.
  • Shoring Works for (B+G+1) Avinash & Kenny Villa Plot # 332-3015, 332-3016 Pearl Jumeirah - Dubai.
  • Shoring Works for Sheet Pile at Palm Jumeirah Dubai.
  • Shoring Works for SBH - Construction of American School of Creative Science on Plot # 3712. Institute Land- Sharjah.
  • Shoring Works for Dubai Water Canal -Infrastructure Package - 2. Elevating Al Wasl & Jumeirah Street - Dubai
  • Shoring Works for Supply, Installation, Testing & Commissioning of fibra Cement / Glass reinforced epoxy water transmission pipe line and associated works at various location emirates of Dubai.
  • Shoring Works for PT-147-D3: (Business Park Area) Package: Remaining Insfrastructure Works.
  • Shoring Works for Madinat Jumeirah Phase IV .
  • Shoring Works for Irrigation Water Tank - Faimont Hotel - Abu Dhabi.
  • Sheet Pile Shoring Works - Comprehensive Improvement of the Parellel Road (Contract -3C1) EM-68
  • Shoring Works - DIFC Network Extension along road 312 to Za'beel with connecting to WTC for M/s. Empower.
  • Shoring Works for (G+5) on Plot # 99 @ Al Musallah, Sharjah.
  • Construction of (B+5+2) on Plot # H-60 Plam Jumeirah - Dubai
  • Shoring Works for Sewer Line Blockage Rectification Works (400mm. Dia. Pipe) @ Road # 4 - Oasis City Dubai.
  • Permanent Shoriong Works for Additional Store Rome and Car Parking - Dubai.
  • Piling & Shoring Works for (Boring Works for Deep Well + Stel Sheet Pile Shoring Works for Driving & Receiving Pits + Trench Box Shoring System for Pipe Line) Dewatering System @ Jumeirah Park - Dubai.
  • Shoring Works for Micro Tuneling Boxes @ Hamriyah Power Plant to Sajaa.
  • Shoring Works for Temp. Sheets Pile TV Garden Structure - Al Manara Dubai.
  • Shoring Works for Falcon Project at Jebel Ali.
  • Piling Works for G+5P+HC+21 - Sharjah.
  • Shoring Works for Cultural Village Substation - Dubai.
  • Shoring Works for Proposed MAF Polyclinic. DCC - Dubai.
  • Shoring Works for Proposed 750mm. DC Line - Dubai.
  • Piling Works for Building at Al Barsha 1st Dubai.
  • Supply Installation & Commissining of 132/11kv Substation & Associatted Works at Jumeirah - Dubai.
  • Shoring Works for Temp. Trench Box at Dubai.
  • Shoring Works for Var Compensator Station at Ras Al Khor.
  • Shoring Works for B+G+1 Building, Plot # 363-1016. Al Manara Dubai.
  • Shoring Works for G+1 Police Station, Plot # 599-1270, Dubai.
  • Piling Works for Cast Hose Area,EMAL Project. Abu Dhabi
  • Shoring Works for (B+G+9) on Plot # 26-100 @ Dubai Silicon Oasis.
  • Piling Works for 15MIGD SWRO Desalination plant at Ghalilah RAK.
  • Shoring Works for Workshop Building at Studito City - Dubai.
  • Shoring Works for NDRC # 1 & 3 at Abu Dhabi.
  • B+G+1+Staircas+Kitchen Block + Majlis Block + Covered Parking Villa.
  • Expo Center Sharjah Expansion - Sharjah.
  • Shoring Works for School Building @ Moeilah Sharjah.
  • Shoring Works for Irrigation System and Land Scaping ro 3 small projects.
  • Shoring Works for Workshop and Warehouse - Studio City Dubai
  • Shoring Works for Upgrading of Main Pumping Station C&E Port Saeed - Dubai
  • Piling Works Commerical & Residental Building (G+5) Mulk Al Khan Sharjah.
  • Shoring Works for Sheet Pile Reactor Station Warsan.
  • Shoring Works for Sheet Pile Reactor Stationn Jebel Ali
  • Shoring Works for Al Mirgab Mall, Sharjah
  • Shoring Works for (G+4P+15Typ) Building
  • Shoring Works for Irrigation Mains from Jabel Ali.
  • Shoring Works for Dubai Metro Green Line.
  • Shoring Works for Grand Ayla Hotel Al Ain.
  • Shoring & Piling Works fin RAK
  • Shoring Works for Bored Piling at Zatari Filling Station.
  • Shoring Works for Spetic Tank Ind. Area 18 Sharjah.
  • Micro Piling for SL foundation at Emirates Road IC 14E & 8E
  • Shoring Works for Villa - Abraj Al Khaleej.
  • Hiring Sheet Pile 12m. At RAK
  • Secant Pile Works at Ind. Area - Sharjah
  • Shoring Works for Widening & Upgrading of Al A9n - Dubai Road.
  • Shoring Works for Proposed Villa at Umm Suqeim.
  • Shoring Works for Surface Water Discharge.
  • Standard Anchor Works at Al Ain Hospital
  • Sheet Pile Hiring at Dubai.
  • Shoring Works for Pipe Trench, Dubai Al Ain Road.
  • Shoring Works for Boundry Wall at Al Khawaneej 1st Dubai.
  • Shoring Works for Petroleum at Al Ain
  • Titan Pipe Works for proposed Lulu Center at Al Qurm - RAK
  • Piling & Shoring Works for Driving & Receiving Pits at Al Ain Road.
  • Soldier Piles Removing Works at Al Ras Upgrade Station.
  • Shoring Works for Ras Al Khor Crossing.
  • Shoring Works for Car Complex Substation.
  • Shoring Works for ERC Labour Camp Site # 100
  • Shoring System for Fujairah Cable Landing Station.
  • Anchor Works for Plot # 103 at Al Mamzar, Sharjah.
  • Shoring Works for Cultural Center at Al Khalidiya.
  • Stressing Works for Project at UAQ.
  • Stressing Works for Project at UAQ.
  • Shoring System for Workshop & Warehouse at Dubai Studio City.
  • Shoring System for DEWA Substation at Al Ain Road.
  • Shoring System for DEWA Substation at Al Jadaf.
  • Shoring Works for Hamriyah Free Zone for Amana Steel Building.
  • Shoring System for DEWA Substation at Al Hamriyah
  • Shoring System for DEWA Substation at Al Wasel
  • Shoring System for DEWA Substation at Al Barsha
  • Shoring Works for Entrance A & B at Deira City Centre
  • Sheet Pile Works for Palm Deira Extension.
  • Shoring Works for (G+8) Building at Dubai.
  • Shoring Works for Propoesed (G+M+2TF+GYM) Building.
  • Anchors Works for G+47 Commercial Tower
  • Shoring Works for Compact Foundation.
  • Shoring Works for Underground Water Tank.
  • Shoring Works for Sound Stages Complex at Dubai Studio.
  • Piling Works for Palm Jumeirah Substations for ETA.
  • Piling & Shoring Works for B+G+12+28 Floors.
  • Shoring Works for J301 Auto Workshop
  • Shoring Works for Mock Up Appartments at Nakheel Sales Office.
  • Shoring Works for 132/11kv Substation.
  • Trench Shoring Works Using Harmonized System @ Jebel Ali.
  • Shoring Works for AA7025 - Jumeirah lake Tower for M/s. Dutco Balfour Beatty on Plot # 498
  • Shoring Works for (2B+G+10) Building @ International City Dubai.
  • Shoring Works for Using Harmonized System for Dubai Flower Center
  • Sheet Piling Works for Al Butaina Substation - Sharjah.
  • Bored Piles for Deep Wells - Kalba Pumping Station @ Kalba
  • Secant Pile Works for Villa Sh.A.Al Mua'alla
  • Piling Works for (B+G+10+HC) @ Marsa Dubai.
  • Bored Piles @ Al Mussafah Petroleum Area - Abu Dhabi.
  • Sheet Pile Works for Palm Island Access Road - Dubai.
  • Piline Works for Shoreline Appartments at Palm Island Jumeirah.
  • Piling & Shoring Works for Bowing Center - Dubai.
  • Shoring Works at CUC4 site at Dubai Airport
  • Shoring Works for Oasis Village Substation @ Al-Quoz for DEWA
  • Sheet Pile Works at Al Ain - Fujairah Gas Pipe Line.
  • Sheet Pile Works for Sea Water Intake Sohar - Oman
  • Piling & Shoring Works for (2B+G+M+22+HP) Bldg. for Mr. Hassan Abel Bin Hassan Sadiq. Majaz - Sharjah.
  • Shoring Works for H-Beams for ENOC filling stations # 1051 at Muhaisanah IV-Dubai
  • Qeshm Island Fabrication Yard Contract for civil works - Package IV piling works - Iran.
  • Sheet Piling Works for ENOC Filling Station Umm Saqeem, Dubai
  • Qeshm Island Fabrication Yard Contract for civil works - Package IV Shoring Works - Iran.
  • Sheet Pile Cofferdam For Link Road Between Al Qurum St. & Shati Al Qurum Muscat - Oman.
Share
Piling & Shoring Construction
Are you looking for Piling & Shoring solutions similar to this? Get in touch today.

Search Projects

Categories

Road & InfrastructureBuilding ConstructionBridges & UnderpassesAsphalt & Road MarkingReady Mix ConcretePiling & Shoring

Tags

ConstructionAsphalt & Road MarkingRoads & InfrastructureBuilding ConstructionBridges & UnderpassesReady Mix ConcretePiling & Shoring

Related Projects

Piling & Shoring

List of Piling & Shoring Projects

Request Further Information

To receive our pre-qualification document & company profile, drop your email here.

Build with Al Marwan Construct

Our wide range of services make us your one-stop solution for construction projects.

Mon - Fri 8:00am to 6:30pm
Our services
EXPLORE AL Marwan Construct

COPYRIGHT to AL Marwan 2023 | ALL RIGHTS RESERVED